11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer

Product Details
Customization: Available
Transport Package: Wooden Case
Trademark: ROOQ
Manufacturer/Factory & Trading Company

360° Virtual Tour

Diamond Member Since 2021

Suppliers with verified business licenses

Audited Supplier

Audited by an independent third-party inspection agency

Number of Employees
103
Year of Establishment
2014-05-30
  • 11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
  • 11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
  • 11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
  • 11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
  • 11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
  • 11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
Find Similar Products

Basic Info.

Origin
Wenzhou/China
HS Code
9030849000
Production Capacity
500PCS/Month

Product Description

11kv & 33kv Outdoor Metering Unit Metering Box with CT PT TransformerBasic Info.
HS Code 9030849000 Production Capacity 200PCS/Month

Product Description
Combination Instrument Transformer
 

The combined instrument transformer have 5 version with different voltage 3/6/12/36KV.The transformer are designed for 3 phase electric systems of rated frequency of 50/60Hz.The products are used in metering electric energy, voltage controlling and relay protection applications.


Technical specification:

1 - 
Rated voltage:6KV/12KV/36KV.

2 - Accuracy class:0.5/0.2 and 0.5s/0.2s.

3 - 
Rated voltage ratio:6kv/100; 1k/100; 3300/100

4 - Rated current ratio: 5-300/5

5 - Note: The products may be custom manufactured to a higher ratio.



Structure feature

The product mainly consists of combined instrument transformer and watt-hour meter. The combined transformer is equipped with 2 or 3 single phase VT and CT units.The transformer is insulated in 25# transformer oil. The outlet terminals of primary and secondary windings are encapsulated in porcelain bushing and fixed on the panel.Watt-hour meter tank is fixed on the flank of combined instrument transformer and comprises one active watt-hour meter and reactive watt-hour meter. The products are reliable, accurate, light and convenient in installation. They are also designed against stealing electricity.

1 - The transformer equipped with primary and secondary winding. The windings are fixed to the iron core bar by casting.

2 - For the two secondary windings, the first one is for either measuring or protection purpose; the other is for being connected into an open-delta connection in a 3 phase system. 

3 - The outlet of the primary winding is insulated from the earth to a correspondent level.

4 - The secondary terminal board is covered with a transparent cover made of plastic.

5 - The bolted earthed clamp is located on the transformer base plate.

6 - The transformer is fixed onto the base plate by four screws.
11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer
11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer11kv & 33kv Outdoor Metering Unit Metering Box with CT PT Transformer

Send your message to this supplier

*From:
*To:
*Message:

Enter between 20 to 4,000 characters.

This is not what you are looking for? Post a Sourcing Request Now
Contact Supplier
People who viewed this also viewed